Thursday, February 3, 2011

Maintenance 2010



Much behind the scenes preparations for our 2011 campers.


Annual maintenance of driveway, made especially necessary because

of the 2 month ice and snow.


Another ditch dug for water drainage and 70 more tons of road coverings.


More diggers, road scalpings and rollers to smooth the surface.


Re-doing all the pitch signs.


Processing the dead trees for logs for trugs.




Repairing and improving the bursts on the water supply to the stand pipes.




Regenerating the gallery and entranceway.